Separating styrene from C6-C8 aromatic hydrocarbons

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8766028
APP PUB NO 20130116489A1
SERIAL NO

13373094

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention disclosed relates to a process for refining a hydrocarbon feed to make substantially styrene-free C6-C8 aromatic hydrocarbons (BTX). The hydrocarbon feed, for example, unhydrotreated pyrolysis gasoline, is distilled to make a BTX rich stream containing styrene which is fractionated to separate C6 and C7 hydrocarbons from C8 hydrocarbons including styrene. Styrene in the C8 hydrocarbons reacts in the presence of a selective etherification catalyst with a C1-C3 lower alkyl alcohol to form the corresponding styrene ether, which is then separated by distillation into a styrene ether stream and a C8 hydrocarbons rich stream. The C8 hydrocarbons rich stream is then re-mixed with the C6 and C7 hydrocarbons, and sent to hydrogenation reactors to remove sulphur and olefinic hydrocarbons to form substantially styrene-free BTX.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CPC CORPORATIONNO 3 SUNG-REN ROAD SHIN-YI DISTRICT TAIPEI 11010 TAIWAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chuang, Karl Tze-Tang Edmonton, CA 17 131
Lee, Adam T Dallas, US 24 435
Lin, Tzong-Bin Chia-Yi, TW 31 390
Shen, Hung-Chung Chia-Yi, TW 25 332
Wu, Kuang-Yeu Plano, US 30 383

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 1, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00