Method for laying pipes and a machine for actuating the method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8764344
APP PUB NO 20120177444A1
SERIAL NO

13496878

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for laying a pipe includes predisposing first and second releasable gripping devices for firmly gripping or releasing the pipe. The gripping devices are located along the longitudinal direction of the pipe. The gripping devices when activated grip and move the pipe so that only a predetermined longitudinal pipe section is received in the laying site. The gripping devices are rearranged and activated, instant by instant, so that the pipe is at all times solidly gripped by at least one gripping device. The above step is repeated until multiple longitudinal sections are housed in the laying site. A machine for laying pipe has gripping devices independently activatable for firmly gripping or releasing the pipe and also for moving the first and/or second gripping devices a predetermined number of times while gripping the pipe, for moving multiple longitudinal pipe sections into the laying site.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ENERECO S P A61032 FANO (PU)

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ciaroni, Giuliano Fano, IT 1 0
Simoncelli, Aurelio Pesaro, IT 2 0

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jan 1, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00