Power conversion and control systems and methods for solid-state lighting

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8760078
APP PUB NO 20120081035A1
SERIAL NO

12897066

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A solid-state lighting system comprises a plurality of light-emitting devices (e.g., light-emitting diodes) and an alternating current to direct current (AC-DC) converter that converts AC power to DC power for powering the plurality of light-emitting devices. The AC-DC converter is configured to perform AC-DC conversion directly, without the need for or use of a bridge rectifier or step-down transformer. According to one aspect of the invention, the light-emitting devices of the solid-state lighting system are autonomous and individually powered by a plurality of DC power supplies generated from the DC power produced by the AC-DC converter. According to another aspect, a plurality of phase-offset dimmer control signals are generated based on waveform distortions in a dimming signal produced by a conventional dimmer switch. The phase-offset dimmer control signals are used to individually control the dimming of the light-emitting devices.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MCCUNE EARL W2383 PRUNERIDGE AVE STE 3 SANTA CLARA CA 95050

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
McCune,, Jr Earl W Santa Clara, US 50 545

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 24, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00