Module-based oxy-fuel boiler

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8752383
APP PUB NO 20120216539A1
SERIAL NO

13335238

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A boiler system for producing steam from water includes a plurality of serially arranged oxy fuel boilers. Each boiler has an inlet in flow communication with a plurality of tubes. The tubes of each boiler form at least one water wall. Each of the boilers is configured to substantially prevent the introduction of air. Each boiler includes an oxy fuel combustion system including an oxygen supply for supplying oxygen having a purity of greater than 21 percent, a carbon based fuel supply for supplying a carbon based fuel and at least one oxy-fuel burner system for feeding the oxygen and the carbon based fuel into its respective boiler in a near stoichiometric proportion. The oxy fuel system is configured to limit an excess of either the oxygen or the carbon based fuel to a predetermined tolerance. The boiler tubes of each boiler are configured for direct, radiant energy exposure for energy transfer. Each of the boilers is independent of each of the other boilers.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • JUPITER OXYGEN CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ochs, Tom L Albany, US 4 25
Oryschyn, Danylo B Philomath, US 5 80
Patrick, Brian R Chicago, US 9 174
Summers, Cathy A Albany, US 8 109

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 17, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00