Multi-phase converter for DC power supply with two choppers having magnetically coupled reactors

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8750008
SERIAL NO

13574289

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A power supply device includes: a magnetic-coupling-type multi-phase converter having first and second chopper circuits that respectively adjust respective currents flowing in first and second reactors magnetically coupled to each other, and performing voltage conversion between a DC power supply and a load; and a control circuit. The control circuit includes a determination unit and a current control unit. The determination unit determines whether the temperature of the power supply is lower than a reference temperature. In the case where the power supply temperature is lower than the reference temperature, the current control unit uses a value determined by adding an offset amount to a detected value of the reactor current to set a duty command value for the first chopper circuit and uses a detected value of the reactor current to set a duty command value for the second chopper circuit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHATOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ang, Wanleng Toyota, JP 45 825
Itagaki, Kenji Okazaki, JP 72 399
Sugiyama, Yoshinobu Toyota, JP 44 739

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Dec 10, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00