Lubrication composition with an adaptable coefficient of friction, for a threaded element of a threaded tubular connection component

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8735334
APP PUB NO 20110285124A1
SERIAL NO

13123909

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A film-forming lubrication composition for make-up of threaded connections, intended to cover at least one threading (FE, FI) and a make-up abutment (BVM, BVF) of a threaded element (EM, EF) of a component (T2, T1) of a threaded tubular connection (JF) with a solid state film which adheres to the threading (FE, FI) and to said make-up abutment (BVM, BVF), said make-up abutment (BVM, BVF) being intended to bear against another abutment (BVF, BVM) of another component (T1, T2) of said threaded tubular connection (JF) during the terminal make-up phase, and said lubrication composition comprising a matrix. The matrix further comprises at least one rheoresistant material selected so as to endow said composition, as a complement to lubrication, with a shouldering torque which is at least equal to a threshold value.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CORPORATIONTOKYO JAPAN

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gard, Eric Sathonay Village, FR 20 121
Goto, Kunio Osaka, JP 73 672
Pinel, Eliette Sainte-Euphémie, FR 16 115

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 27, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00