Controlled polarity group III-nitride films and methods of preparing such films

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8734965
APP PUB NO 20110020602A1
SERIAL NO

12895018

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides methods of preparing Group III-nitride films of controlled polarity and substrates coated with such controlled polarity films. In particular, the invention provides substrate preparation steps that optimize the substrate surface for facilitating growth of a Group III-polar film, an N-polar film, or a selectively patterned film with both a Group III-polar portion and an N-polar portion in precise positioning. The methods of the invention are particularly suited for use in CVD methods.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SEVIN ROSEN IX AFFILIATES FUND L PTWO GALLERIA TOWER 13455 NOEL ROAD SUITE 1670 DALLAS TX 75240
INTERSOUTH PARTNERS VI L P102 CITY HALL PLAZA SUITE 200 DURHAM NC 27701
MCNC ENTERPRISE FUND L P4505 EMPEROR BLVD SUITE 130 DURHAM NC 27703
SEVIN ROSEN FUND IX L PTWO GALLERIA TOWER 13455 NOEL ROAD SUITE 1670 DALLAS TX 75240
H I G VENTURE PARTNERS II L P1001 BRICKELL BAY DR MIAMI FL 33131
H I G VENTURES-HEXATECH LLC1001 BRICKELL BAY DR MIAMI FL 33131

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Collazo, Ramón R Raleigh, US 2 12
Schlesser, Raoul Cary, US 12 168
Sitar, Zlatko Raleigh, US 11 128

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 27, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00