Device for feeding a charge including integrated energy storage

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8723365
SERIAL NO

12314775

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A device for supplying power to a load, requiring both a pre-determined supply of electrical power and high power for short durations of the operating cycle of the load, where the operating cycle is repeated. The power supply device includes a connection to an electrical grid, an AC voltage transformation circuit, a voltage rectification means and a plurality of DC/DC converters mounted in series to terminals of the load. Each of the DC/DC converters has a storage capacitor mounted in parallel to it and at least one of the DC/DC converters is supplied directly by the voltage rectification means. At least another one of the DC/DC converters is not supplied directly by the voltage rectification means. The power supply device may compensate for losses in the power supply device and load, and may substantially continually and uniformly balance voltages at terminals of the storage capacitors.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH1211 GENÈVE 23

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bordry, Frederick Meyrin, CH 1 3
Burnet, Jean-Paul Chevry, FR 1 3
Fahrni, Claude Delémont, CH 1 3
Rufer, Alfred Villars-s-Yens, CH 6 168

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 13, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00