Polyurethane oil de-emulsification unit

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8721895
APP PUB NO 20110226696A1
SERIAL NO

13080475

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for separating an aqueous emulsion including an aqueous phase and an non-aqueous phase into separated aqueous and non-aqueous phases, to provide a recovered non-aqueous phase, and to provide a recovered aqueous phase containing an acceptable level of the non-aqueous phase. In the process, at least one body, and preferably two or more bodies, of polymeric material with a high surface area, typically a foam material or polymer chips, is used in a horizontal flow treatment system to break the emulsion and thus provide both the aqueous and non-aqueous phases as two separate flows. A wide range of polymers can be used in the system as the polymeric material including polyurethane, polypropylene, polystyrene, polyester, and polyethylene. If a very low level of non-aqueous phase in the effluent is required, for example to meet potable water standards, then a Kozlowski polyurethane, as described in U.S. Pat. No. 5,239,040, is preferred as the last Polymeric material body.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PROSEP INCMONTREAL QUEBEC H3A 1T8

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Benachenou, Amine Montreal, CA 4 31
Parent, Jean-Pierre Montreal, CA 4 26

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 13, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00