Method for recovering pulping chemicals and reducing the concentration of potassium and chloride therein

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8721837
APP PUB NO 20140027076A1
SERIAL NO

13709140

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a digester, wood chips and white liquor are combined and cooked under pressure to pulp the wood. This produces black liquor which is concentrated and burned in a recovery boiler. The recovery boiler produces ash that contains sodium, sulphur, potassium and chloride. The ash is dissolved and subjected to a process that recovers sodium sulfate and burkeite. The concentration of potassium and chloride is reduced, in part at least, by subjecting the ash to adiabatic cooling in a crystallizer which produces glaserite and a purge stream rich in chloride. By leaching the glaserite, sodium sulfate is removed from the glaserite, leaving potassium sulfate. The recovered sodium sulfate and burkeite can be recycled and used as pulping chemicals. The removed potassium and chloride can be further treated or appropriately discarded.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
VEOLIA WATER TECHNOLOGIES INC4001 WESTON PKWY CARY NC 27513

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Begley, Michael S Lisle, US 3 3
Gallot, Jean-Claude Naperville, US 4 58

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 13, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00