Piezoelectric thin film, method of manufacturing piezoelectric thin film, piezoelectric element, and ink jet recording head

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8715823
APP PUB NO 20120251820A1
SERIAL NO

13524249

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There are disclosed a piezoelectric thin film having less non-uniform portions and holding satisfactory piezoelectric characteristics, a method of manufacturing the film, a piezoelectric element using the piezoelectric thin film, and an ink jet system recording head using the piezoelectric element. In the piezoelectric thin film of perovskite crystals formed on a substrate by a sol-gel process and represented by a general formula Pb(1-x)Lax(ZryTi1-y)O3 (where 0≦x<1, 0.05≦y≦1), a film thickness of the thin film is 1000 nm or more and 4000 nm or less, and a difference between a maximum value and a minimum value of y in an arbitrary portion of the thin film is 0.05 or less.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CANON KABUSHIKI KAISHAJAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Eritate, Shinji Kawasaki, JP 21 196
Kobayashi, Motokazu Yokohama, JP 69 234
Kubota, Makoto Kawasaki, JP 219 2960
Maeda, Kenji Nakatsugawa, JP 283 3363
Shimizu, Chiemi Hirakata, JP 18 104
Uchida, Fumio Daito, JP 30 196

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 6, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00