Pulverized coal boiler

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8714096
APP PUB NO 20120137938A1
SERIAL NO

13390597

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pulverized coal boiler of the present invention is structured so as to form, among upper and lower after-air nozzles, an opening serving as an outlet of the lower after-air nozzle positioned on the upstream side is formed in a rectangular shape, a cylindrical section for defining a minimum flow path area of combustion air flowing through a flow path of the after-air nozzle is installed inside of the lower after-air nozzles along the flow path of the lower after-air nozzle, and a swirl blade for giving a swirl force to the combustion air flowing through the flow path of the after-air nozzles is installed inside of the cylindrical section, and the flow path of the lower after-air nozzles is formed so that a flow path area of the flow path of the after-air nozzles through which the combustion air flows from a position where the cylindrical section is installed toward the opening of each of the lower after-air nozzles is expanded.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MITSUBISHI POWER LTD3-1 MINATOMIRAI 3-CHOME NISHI-KU YOKOHAMA-SHI KANAGAWA 220-8401

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ochi, Yusuke Kure, JP 16 79
Okazaki, Hirofumi Mito, JP 49 420
Orii, Akihito Hitachi, JP 17 151

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Nov 6, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00