System and method for increasing roadway width incorporating a reverse oriented retaining wall and soil nail supports

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8708597
APP PUB NO 20130136538A1
SERIAL NO

13749269

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method are provided for increasing the width of an existing roadway. The system incorporates a reverse-oriented retaining wall and soil nail supports. The retaining wall is formed by a first set of soil nails, wire mesh material, and one or more geotextile material layers. An alternate embodiment forms the retaining wall with a plurality of concrete blocks stacked and spaced to form a block wall. The blocks are mounted over the first set of nails. Backfill material fills a gap between the existing sloping surface and the retaining wall. A second set of soil nails can be provided for additional subsurface support. An upper surface of the backfill material can be paved to form the extended roadway width.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
SOIL-NAIL HOLDINGS LLC4475 E 74TH AVE SUITE 100 COMMERCE CITY CO 80022

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Barrett, Colby Grand Junction, US 14 61
Barrett, Robert K Grand Junction, US 15 240
Beard, Nathan Fruita, US 13 64
Lobato, Cameron Grand Junction, US 2 5
Ruckman, Albert C Pallsade, US 10 80
Ruckman, Timothy Allen Phoenix, US 10 25

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 29, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00