System integration to produce concentrated brine and electricity from geopressured-geothermal reservoirs

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8707697
SERIAL NO

12653047

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A systems design is disclosed which converts Geopressured-Geothermal (GPGT) brine into saturated brine in concert with the production of electricity from GPGT brine energy. The design integrates a GPGT conversion system which super-concentrates a portion of the GPGT brine, utilizing that portion's thermal energy, with a system designed to produce electricity from the remainder of GPGT brine energy. The end-brine from the electricity producing system is concentrated (sub-saturated) in a spray evaporation pond, which serves as a heat sink for both systems, and is combined with the super-saturated product brine from the GPGT conversion system, resulting in a saturated brine end-product. The saturated brine can be used for beneficial purposes, including for use as bulk material in the construction of salinity gradient solar ponds (SGSP), which collect, store, and deliver solar thermal baseload power (e.g., for electricity generation).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NITSCHKE GEORGENot Provided

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nitschke, George New Ipswich, US 2 137

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 29, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00