Method and apparatus for breaking scale from sheet metal with recoiler tension and rollers adapted to generate scale breaking wrap angles

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8707529
APP PUB NO 20100146757A1
SERIAL NO

12332803

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A metal processing apparatus comprises a scale breaker apparatus having a plurality of rollers positioned in a staggered arrangement and engaging first and second surfaces of sheet metal. The staggered arrangement creates clearances between the rollers of the first and second surface rollers sufficient to enable the sheet metal to conform to a portion of an outer periphery of at least one of the rollers while passing between the first and second surface rollers under a tensile force. The metal processing apparatus further comprises a recoiler adapted to coil the length of sheet metal. The recoiler subjects the sheet metal passing through the scale breaking apparatus to a tensile force sufficient to conform the sheet metal to a portion of the outer periphery of at least one of the rollers with a wrap angle sufficient to break scale from the sheet metal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
THE MATERIAL WORKS LTD101 SOUTH MAIN STREET RED BUD IL 62278

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Voges, Kevin C Shiloh, US 16 152

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 29, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00