Peanut butter with an organic stabilizer and method for manufacture thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8697173
APP PUB NO 20120213908A1
SERIAL NO

13440075

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention is directed to a novel organic peanut butter formulation and method for production. The peanut butter includes an organic, non-hydrogenated palm stearin oil stabilizing agent that reduces or prevents separation of oils from the peanut butter during storage. Peanut butter incorporating the palm oil, methods for manufacturing the peanut butter, and foods incorporating the peanut butter are also disclosed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ONCE AGAIN NUT BUTTER INC12 SOUTH STATE STREET PO BOX 249 NUNDA NY 14517

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Alexander, Sandra Dansville, US 2 13
Blatz, Elizabeth A Edgewater, US 2 13
Carlin, Darin Nunda, US 2 13
Carpenter, Peter Portageville, US 5 93
Eurhardt, Lorraine Nunda, US 2 13
Galton, Mark Nunda, US 2 13
Halbert, Ellen Dansville, US 2 13
Hinrich, Esther Dalton, US 2 13
Howe, David Nunda, US 29 114
Jones, Stephen Nunda, US 187 2680
Kirwan, Lloyd Nunda, US 2 13
Potter, Constance Nunda, US 2 13
Thaler, Jeremy Dansville, US 2 13
Wilkins, Richard Hunt, US 12 126
Zangerle, Linda Nunda, US 2 13

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 15, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00