Joint construction for coupling conduit sections

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8695218
APP PUB NO 20130106101A1
SERIAL NO

13717110

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A joint construction includes first and second conduit sections having coaxially overlapping end areas. A coupling member has a first end received within the end of the first conduit section and a second end with external threads. A bore of the coupling member receives the second section end area. A plurality of protrusions are formed on an outer surface of the coupling member. The plurality of protrusions engage a plurality of complimentary features formed on the end area of the first conduit section. A gland nut has threads configured to engage the external threads of the second end of the coupling member. A washer is disposed on the second conduit section between the second end of the coupling member and the gland nut. The washer is configured to engage the end area of the second conduit section to resist relative axial movement between the first and second conduit sections.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ALLIED TUBE & CONDUIT CORPORATIONHARVEY IL 60426

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Scartozzi, Giulio Chicago Heights, US 7 38

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 15, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00