Processes for producing light olefins

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8692045
APP PUB NO 20120123179A1
SERIAL NO

13298137

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for producing light olefins is provided. A feedstock enters a pre-reaction zone and contacts a catalyst comprising at least one silicon-aluminophosphate molecular sieve and produces a gas-phase stream; the gas-phase stream and the catalyst enter at least one riser, and the gas-phase stream and the catalyst pass from an outlet of the at least one riser and enter a gas-solid rapid separation zone; the separated gas-phase stream enters a separation section; a first portion of the separated catalyst returns to the pre-reaction zone, and a second portion is regenerated in a regenerator; wherein an inlet of the at least one riser extends into the pre-reaction zone, about 60% to about 90% of the height of the at least one riser passes through a heat exchange zone, and the outlet extends into the gas-solid rapid separation zone.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHINA PETROLEUM & CHEMICAL CORPORATIONNO 22 CHAOYANGMEN NORTH STREET CHAOYANG DISTRICT BEIJING 100728 100728
SHANGHAI RESEARCH INSTITUTE OF PETROCHEMICAL TECHNOLOGY SINOPEC1658 PUDONG BEI ROAD PUDONG NEW AREA SHANGHAI 201208

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chen, Wei Shanghai, CN 2011 24064
Qi, Guozhen Shanghai, CN 20 44
Yu, Zhinan Shanghai, CN 13 16
Zhong, Siqing Shanghai, CN 20 80

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 8, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00