Tunnel reinforcement structure and tunnel construction method capable of controlling ground displacement using pressurization

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8690478
APP PUB NO 20120107049A1
SERIAL NO

13271907

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a tunnel reinforcement structure capable of controlling ground displacement using pressurization, including: reinforcements adapted to be forcedly inserted into the bored holes formed along the outer surface of the section to be excavated of the tunnel; auxiliary reinforcements disposed between the reinforcements from a point between 4 m and 8 m inwardly from the ends of the reinforcements; steel ribs disposed on the inner four faces of the excavation face of the tunnel; pressurizing bags each provided between the steel ribs and the excavated inner surface of the tunnel; a concrete part adapted to be cast between the steel ribs; and lining concrete adapted to be cast to the steel ribs and the inner surface of the concrete part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HYUNDAI ENGINEERING & CONSTRUCTION CO LTD140-2 GYE-DONG CHONGRO-KU SEOUL 110-793

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kim, Dae Young Gyeonggi-do, KR 177 1370

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 8, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00