Power control methods

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8686580
APP PUB NO 20120074698A1
SERIAL NO

13245101

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In an oscillating water column (OWC) assembly power may be generated based on a power reference that is derived from an estimate of the available mechanical power in the air turbine 2 or a measured pressure drop across the turbine. The power reference is used to derive a power control torque reference within a power controller 14. A speed controller 16 uses a comparison of a measured speed of the generator 8 and a maximum speed limit to derive a speed control torque reference. A selector function 22 selects whichever of the power control and speed control torque references is the maximum at any time instant. The selected torque reference is input to an anti stall torque function 24 where it is selectively modified by applying a speed dependent gain that decreases with decreasing turbine speed, preferably so that the main torque reference is zero for a minimum speed limit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
GE ENERGY POWER CONVERSION TECHNOLOGYBOUGHTON ROAD RUGBY WARWICKSHIRE CV21 1BU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cunningham, Matthew James Leicester, GB 2 51
Gray, Simon Leicester, GB 12 40
Hearns, Gerald Irvine, GB 1 4
Smith, Christopher Alan Leicester, GB 6 89

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00