Ski or snowboard and method for the production thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8684392
SERIAL NO

13564910

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a ski or a snowboard, comprising a multilayered sliding board body comprising at least one strength-providing upper strap, at least one strength-providing lower strap, at least one strip-like core element arranged in between which is delimited essentially by a first and a second flat side and by lateral side surfaces, and which core element comprises at least in sections of its longitudinal extension an essentially trapezoidal cross section with a first base side with a first length and a second base side essentially parallel thereto with a second comparatively shorter length. Furthermore, the invention relates to a method for producing a prefabricated semi-finished product for the production of such a ski or snowboard, a suitably assembled semi-finished product, as well as a method for producing the ski or snowboard according to the invention by using the prefabricated semi-finished product.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ATOMIC AUSTRIA GMBH5541 ALTENMARKT IM PONGAU

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Holzer, Helmut St. Johann, AT 61 775
Klausner, Georg St. Johann, AT 7 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Oct 1, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00