and reduction of unconverted methane

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8671695
APP PUB NO 20100199682A1
SERIAL NO

12700353

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This invention relates to a process for the production of hydrogen from a hydrocarbon feedstock and water vapor comprising a stage in which a portion of the hydrocarbon feedstock is sent to a vapor-reforming unit and another portion of the hydrocarbon feedstock is sent directly to an autothermal reformer in a mixture with the effluent that is obtained from a vapor-reforming unit, a vapor-reforming stage of the hydrocarbon feedstock in a vapor-reforming unit, a stage for autothermal reforming of the stream that is obtained in the preceding stage as well as the hydrocarbon feedstock that is sent directly into an autothermal reformer, a vapor conversion stage of the synthesis gas that is obtained in the preceding stage, and a stage for recovering carbon dioxide that is present in the stream that is obtained in the vapor conversion stage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IFP92852 RUEIL-MALMAISON CÉDEX

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ambrosino, Jean-Louis Ternay, FR 12 95
Fischer, Beatrice Lyons, FR 37 262
Giroudiere, Fabrice Orlienas, FR 28 122

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 18, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00