Hydrated form of erlotinib free base and a process for preparation of erlotinib hydrochloride polymorph form a substantially free of polymorph form B

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8669265
APP PUB NO 20130252978A1
SERIAL NO

13900647

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a novel and stable hydrated form of erlotinib free base, and a process for its preparation thereof. The present invention also provides a process for preparation of erlotinib hydrochloride crystalline polymorph a substantially free of polymorph B. The present invention further relates to erlotinib hydrochloride crystalline particles having mean particle size (D50) ranging from about 4 μm to 15 μm and 90 volume-% of the particles (D90) ranging from about 14 μm to 30 μm, to the methods for the manufacture of said crystalline particles, and to pharmaceutical compositions comprising said crystalline particles.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HETERO RESEARCH FOUNDATIONPLOT NO B-80 & 81 A P I E BALANAGAR HYDERABAD 500018

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Rao, Thungathurthy Srinivas Hyderabad, IN 1 7
Reddy, Bandi Parthasaradhi Hyderabad, IN 53 172
Reddy, Dasari Muralidhara Hyderabad, IN 33 57
Reddy, Kura Rathnakar Hyderabad, IN 36 140
Reddy, Rapolu Raji Hyderabad, IN 19 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 11, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00