Method for preparing aliskiren and its intermediates thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8664440
APP PUB NO 20130225841A1
SERIAL NO

13639144

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for preparing Aliskiren and intermediate thereof, which comprises the following steps: reacting 4-bromo-1-methoxy-2-(3-methoxypropoxy)benzene with magnesium isopropyl chloride and n-BuLi to obtain the compound of formula XXII; reacting the product of methylsulfonylation of the compound of formula XIX with anhydrous LiBr to obtain the compound of formula XXI; obtaining the intermediate of Aliskiren shown as formula XV by reacting the compound of formula XXII with the compound of formula XXI in an ether as the solvent and in the presence of a catalyst containing iron; then reacting the compound of formula XV with the compound of formula VII to obtain the compound of formula XXIII, following removing R1 from the amino group and obtaining Aliskiren shown as formula I.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ZHEJIANG TIANYU PHARMACEUTICAL CO LTD318020 JIANGKOU CHEMICAL DEVELOPMENT ZONE HUANGYAN DISTRICT TAIZHOU CITY ZHEJIANG PROVINCE (NO 8 XINYUAN ROAD) TAIZHOU CITY ZHEJIANG PROVINCE 318020

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Rongde Taizhou, CN 1 0
Peng, Lingchao Taizhou, CN 1 0
Tu, Yongjun Taizhou, CN 6 1
Zhang, Yi Taizhou, CN 1881 15120

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 4, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00