Thick blown films

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8664337
APP PUB NO 20130022804A1
SERIAL NO

13515828

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention is a film having a thickness greater than 100 microns comprising from 10 to 100 percent by weight of a polyethylene polymer made by the process of a) selecting a target polyethylene resin having a density, as determined according to ASTM D792, in the range of from 0.90 g/cm3 to 0.955 g/cm3, and a melt index, as determined according to ASTM D1238(2.16 kg, 190 C), in the range of from 0.01 g/10 min to 10 g/10 min; b) reacting said target polyethylene with an alkoxy amine derivative in an amount less than 900 parts derivative per million parts by weight of total polyethylene resin under conditions sufficient to increase the melt strength of the target polyethylene resin; and c) forming a thick film from the modified target resin. The present films include those which can achieve similar processability as those containing unmodified linear polyethylene despite having at least 10% less LDPE resins in the formulation.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
DOW BRAZIL S ABRAZIL ST PAUL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Gomes, Jorge Sao Paulo, BR 2 5
Mazzola, Nicolas Jundiai, BR 3 12
Pollard, Maria Pearland, US 13 18
Turner, Michael Sugar Land, US 99 1758

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 4, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00