Erase and soft program within the erase operation for a high speed resistive switching memory operation with controlled erased states

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8659931
SERIAL NO

13488392

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Structures and methods of operating a programmable impedance element are disclosed herein. In one embodiment, a method of operating a programmable impedance element can include: (i) determining an operation to be performed on the programmable impedance element, where the programmable impedance element includes a solid electrolyte between an active electrode and an inert electrode; (ii) in response to the determined operation being a program operation, programming the programmable impedance element by completing formation of a conductive path from a partial conductive path between the active and inert electrodes; and (iii) in response to the determined operation being an erase operation, erasing the programmable impedance element by substantially dissolving the conductive path, and then by forming the partial conductive path.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ADESTO TECHNOLOGIES CORPORATION1250 BORREGAS AVENUE SUNNYVALE CA 94089

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ertosun, Mehmet Günhan San Francisco, US 3 29

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 25, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00