System and method for regulating electrical and thermal energy generated by co/trigeneration energy system in multi-source energy plant

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8655497
APP PUB NO 20110245986A1
SERIAL NO

13060155

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for regulating electrical and thermal power generated by an energy system in a multi-source energy plant that comprises one or more loads. The energy system comprises an electronic unit implementing a multi-objective function (Fmo) that comprises: first computation parameters (PTi, Oi) comprising values of the electrical and thermal powers exchanged within the multi-source plant between a cogeneration module, loads, auxiliary sources and an electric network; and a set of second (Ci, Ai) and third computation parameters (Ni) correlated to the costs of management and exchange of the electrical and thermal powers within the energy plant. The method comprises the step of determining optimal values (PUi) of the electrical and thermal powers that the energy system must supply to minimize the multi-objective function (Fmo), and the step of varying the electrical and thermal powers generated by the cogeneration module as a function of the optimal values calculated (PUi).

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
C R F SOCIETA CONSORTILE PER AZIONISTRADA TORINO 50 ORBASSANO (TORINO) I-10043

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Anzioso, Franco Orbassano, IT 4 44
Campanile, Pasquale Orbassano, IT 3 50

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00