Method and module for controlling rotation of a motorized spindle

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8653765
APP PUB NO 20110279075A1
SERIAL NO

13194589

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In a method and module for controlling rotation of a motorized spindle driven by a driving unit, a sensing unit senses vibration of the spindle and generates a voltage signal corresponding to the vibration of the spindle. A processing unit receives the voltage signal from the sensing unit, generates an adjusting ratio equal to a reference voltage corresponding to a predetermined vibration level of the spindle by the voltage signal upon detecting that the voltage signal is greater than the reference voltage and is less than a predetermined threshold voltage that is greater than the reference voltage, and outputs a control signal corresponding to the adjusting ratio to the driving unit such that the driving unit reduces a rotation speed of the spindle by the adjusting ratio in response to the control signal from the processing unit.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BUFFALO MACHINERY CO LTD2F NO 8 LANE 252 JHONGSHAN N RD DAYA TOWNSHIP TAICHUNG COUNTY
DEPARTMENT OF ELECTRICAL ENGINEERING NATIONAL CHANG-HUA UNIVERSITY OF EDUCATION THENO 1 JINDE RD CHANGHUA CITY CHANGHUA COUNTY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Paul Taichung, TW 155 3451
Chen, Tsair-Rong Hemei Township, Changhua County, TW 41 133
Lu, Chin-Sheng Taichung, TW 2 4
Row, Jeen-Sheen Miaoli, TW 10 24

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00