Copper alloy with high strength and high conductibility, and method for manufacturing same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8652274
APP PUB NO 20120312431A1
SERIAL NO

13580954

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A copper alloy includes Si to facilitate deoxidation, and can be easily manufactured even when including elements such as Cr or Sn. The copper alloy has high conductivity and high workability without negatively affecting the tensile strength. The copper alloy contains 0.2 to 0.4 wt % of Cr, 0.05 to 0.15 wt % of Sn, 0.05 to 0.15 wt % of Zn, 0.01 to 0.30 wt % of Mg, 0.03 to 0.07 wt % of Si, with the remainder being Cu and inevitable impurities. A method for manufacturing the copper alloy includes obtaining a molten metal having the described composition; obtaining an ingot; heating the ingot at a temperature of 900-1000° C. to perform a hot rolling process; cold rolling; performing a first aging process at a temperature of 400-500° C. for 2 to 8 hours; cold rolling; and performing a second aging process at a temperature of 370-450° C. for 2 to 8 hours.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
POONGSAN CORPORATION680-1 NAEGI-RI POSEUNG-EUP PYEONGTAEK-SI GYEONGGI-DO 451-821

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Choi, Sang Young Seoul, KR 8 83
Jeon, Bo Min Ulsan, KR 5 21
Kim, Dae Hyun Ulsan, KR 276 2095
Kim, In Dal Anyang-si, KR 4 30
Lee, Dong Woo Incheon, KR 126 624
Lee, Ji Hoon Ulsan, KR 152 1420

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 18, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00