Hybrid space vector PWM schemes for interleaved three-phase converters

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8649195
APP PUB NO 20120147639A1
SERIAL NO

13081557

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Systems and methods for controlling a modular three-phase converter including two or more interleaved, parallel connected Voltage Source Converters (VSCs) utilizing a hybrid Space Vector Pulse Width Modulation (SVM) control scheme are provided. For the hybrid SVM control scheme, six active vectors utilized for SVM define six sectors in a space vector plane. Each sector is divided into two or more regions having corresponding optimal SVM switching sequences. In operation, a revolving reference voltage vector is sampled to provide a reference voltage vector. The SVM controller then identifies one of the regions in one of the sectors that corresponds to an angle and, in some embodiments, a magnitude of the revolving reference voltage vector and applies the corresponding optimal SVM switching sequence to the two or more interleaved, parallel connected VSCs.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PEREGRINE POWER LLC27350 SW 95TH AVENUE SUITE 3022 WILSONVILLE OR 97070

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ayyanar, Rajapandian Gilbert, US 11 166
Jain, Amit Kumar Portland, US 16 150
Mao, Xiaolin Tempe, US 22 176

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 11, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00