Method and system for large scale manufacture of thin film photovoltaic devices using multi-chamber configuration

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8642361
APP PUB NO 20120270341A1
SERIAL NO

13456095

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for large scale manufacture of photovoltaic devices includes loading a substrate into a load lock station and transferring the substrate in a controlled ambient to a first process station. The method includes using a first physical deposition process in the first process station to cause formation of a first conductor layer overlying the surface region of the substrate. The method includes transferring the substrate to a second process station, and using a second physical deposition process in the second process station to cause formation of a second layer overlying the surface region of the substrate. The method further includes repeating the transferring and processing until all thin film materials of the photovoltaic devices are formed. In an embodiment, the invention also provides a method for large scale manufacture of photovoltaic devices including feed forward control.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
STION CORPORATION6321 SAN IGNACIO AVENUE SAN JOSE CA 95119

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Farris,, III Chester A Yorba Linda, US 28 376
Lee, Howard W H Saratoga, US 49 599

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 4, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00