System and method for converting an AC input voltage to a regulated DC output voltage using a Z-type converter with rectified switches

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8634217
APP PUB NO 20120081936A1
SERIAL NO

13107438

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An AC to DC converter for converting an AC input voltage to a regulated DC output voltage using a Z-type converter and rectified switches. The Z-type converter includes first and second inductors, a capacitor, two rectified switches and a load device coupled in a cross-coupled configuration. The Z-type converter may be configured according to a Z-source or a quasi-Z-source rectifier network. The AC input voltage is applied to an input and the DC output voltage is developed across the load device. Each rectified switch may be configured as a series-coupled diode and electronic switch or as a dual gate GaN device with a shorted gate. A control network monitors the DC output voltage and develops a control signal for controlling the first and second rectified switches to regulate the DC output voltage. The control network may control the rectified switches based on duty cycle control or current mode control.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INTERSIL AMERICAS LLC1001 MURPHY RANCH ROAD MILPITAS CA 95035

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Walters, Michael M Apex, US 44 1682

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 21, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00