Production of myrtanal from beta-pinene epoxide

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8633338
APP PUB NO 20120330065A1
SERIAL NO

13517403

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention refers to a process for the production of myrtanal from β-pinene epoxide that comprises at least of putting this epoxide in contact with a microporous and crystalline catalyst with pores of a diameter of at least 0.52 nm with an empirical formula for the calcinated and dehydrated form of

description='In-line Formulae' end='lead'Hw(MwTixSnyZrzSi1-w-x-y-z)O2 description='In-line Formulae' end='tail'

    whereM is at least a metal with valence+3 selected from Al, B, Ga, Fe, Cr and combinations of these;w is a molar fraction of M with a value of between 0 and 2(x+y+z);x is a molar fraction of titanium and has a value of between 0 and 0.06;y is a molar fraction of tin and has a value of between 0 and 0.06;z is a molar fraction of zirconium and has a value of between 0 and 0.06;and where at least one of the three values “x”, “y” or “z” is different from zero.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CONSEJO SUPERIOR DE INVESTIGACIONES CIENTIFICAS (CSIC)SERRANO 117 28006 MADRID MADRID SPAIN
UNIVERSIDAD POLITECNICA DE VALENCIA (UPV)46022 VALENCIA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Canós, Avelino Corma Valencia, ES 9 22
De, La Torre Alfaro Olalla Valencia, ES 3 6
Renz, Michael Valencia, ES 17 62

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 21, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00