Safety means for a construction machine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8624752
APP PUB NO 20110254694A1
SERIAL NO

13072460

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to a safety means for a construction machine having a carrier unit and an actuation unit, which is adjustable with respect to the carrier unit, comprising at least one detecting means for detecting the current position of the actuation unit relative to the carrier unit, an indication means with which the current position of the actuation unit relative to the carrier unit can be indicated, and an evaluation unit, by means of which, depending on at least one input value, at least one adjustment range of the actuation unit can be determined, in which the actuation unit is adjustable at a given safety against tilting of the construction machine, whereby the adjustment range can be indicated together with the current position of the actuation unit by means of the indication means.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BAUER MASCHINEN GMBHGERMAN SKEI ROBEN HALLSON SCHROBENHAUSEN BAVARIA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Angermeier, Manfred Karlskron, DE 4 19
Elsner, Thomas Schrobenhausen, DE 23 129
Haas, Josef Schrobenhausen, DE 55 100
Lanzl, Martin Ingolstadt, DE 10 44
Mayr, Markus Ehekirchen, DE 6 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00