System and method for determining physical status of switch elements

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8624601
APP PUB NO 20120081124A1
SERIAL NO

12897455

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

System and methods are provided for monitoring a state of a switch element connecting a DC power supply to a load. A system includes a transformer having first and second windings, where a first end of the second winding electrically coupled to a first switch node of the switch element. The system also includes a transmit circuit configured for providing a waveform at the first winding and a sensor element having galvanically isolated input and output nodes for inducing a monitor signal at the output nodes in response to a signal at the input nodes. The system further includes a receive circuit coupled to the output nodes and configured for generating one or more output signals in response to the monitor signal. The system also includes capacitor elements for providing DC isolation for the second winding with respect to the first switch node and the sensor element.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WILMINGTON TRUST NATIONAL ASSOCIATION1100 N MARKET STREET WILMINGTON DE 19890

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Albean, David Indianapolis, US 3 14
Capps, Charlie Carmel, US 1 6
Heady, David Mooresville, US 2 28
Jaeger, Ronald Indianapolis, US 1 6
Kimes, Justin Indianapolis, US 1 6
Scalzo, Timothy Westfield, US 2 9

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00