Adhesive unit for emblem, method of producing the same, jig for adhering emblem and emblem for adhesion

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8623485
APP PUB NO 20090104393A1
SERIAL NO

12254372

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides an adhesive unit for emblem, which includes: a plurality of double-faced adhesive pieces each having a shape corresponding to a shape of a respective one of a plurality of emblem pieces; a first release film attached to a face of each of the plurality of double-faced adhesive pieces to be adhered to an emblem, so that a mutual positional relationship of the plurality of double-faced adhesive pieces is maintained; and a second release film attached to the other face of each of the plurality of double-faced adhesive pieces opposite to the face to be adhered to the emblem. The present invention also provides a method of producing the adhesive unit for emblem, a jig for adhering emblem, and an emblem for adhesion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NITTO DENKO CORPORATION1-2 SHIMO-HOZUMI 1-CHOME IBARAKI-SHI OSAKA 567-8680
NISSHO CORPORATION9-3 HONJO-NISHI 3-CHOME KITA-KU OSAKA-SHI OSAKA-FU

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Asano, Yoshihiko Shiga, JP 20 535
Hirose, Isao Osaka, JP 28 117
Inokuchi, Shinji Osaka, JP 50 296
Kosaka, Tokuhisa Osaka, JP 9 26

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00