Method of manufacturing mixed beverage

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8623443
APP PUB NO 20060099303A1
SERIAL NO

11266527

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides a method of manufacturing a mixed beverage that offers an excellent flavor and superior preservation stability, and that contains vegetable juice etc. and soybean protein, and a mixed beverage that can be obtained by the manufacturing method. The method of the present invention for manufacturing a mixed beverage includes the following steps. (1) A first step for treating vegetable juice and/or fruit juice with pectin lyase, and then deactivating the pectin lyase. (2) A second step for pH adjusting the pectin lyase treated liquid obtained in the first step so that the final pH of the mixed beverage becomes 3.0 to 4.5. (3) A third step for adding low phytate soybean protein to the pH-adjusted liquid obtained in the second step.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FUJI OIL COMPANY LIMITED1-5 NISHISHINSAIBASHI 2-CHOME CHUO-KU OSAKA-SHI OSAKA 5420086
KAGOME CO LTDNAGOYA-SHI AICHI 460-0003

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hayakawa, Kiro Nasushiobara, JP 8 28
Kamiya, Yuichiro Nasushiobara, JP 1 1
Saito, Tsutomu Osaka, JP 125 1320

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 7, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00