Process of producing liquid fuel from cellulosic biomass

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8618341
APP PUB NO 20090326286A1
SERIAL NO

12534288

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A liquid fuel production process from cellulosic biomass comprises the following steps: (1) providing a mixture of cellulose and water; (2) subjecting the obtained mixture to hydrolysis and catalytic hydrogenation under the presence of acid to obtain mono-sugar alcohol and optional solid material lignin, or subjecting the obtained mixture to hydrolysis to obtain monosaccharide; (3) esterifying the obtained mono-sugar with C2-C5 organic acid to obtain a liquid fuel II, or subjecting the obtained mono-sugar alcohol or monosaccharide to dehydration/hydrogenation to obtain an organic liquid fuel I consisting of alkanes. This process avoids the loss of organic carbon atoms during fermentation, and the sugar derived from cellulosic biomass can be converted to organic carbon in the liquid fuel. The lignin produced by the process can be used for preparing aromatics.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHINA FUEL (HUAIBEI) BIOENERGY TECHNOLOGY DEVELOPMENT CO LTD4TH FLOOR HUANBAO BLD 1 XIANG SHAN ROAD HUAIBEI ANHUI 235000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Sun, Meg M San Diego, US 13 71
Yie, Hongping Huaibei, CN 8 66
Zhu, Zuolin San Diego, US 24 74

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00