Process and installation for the production of stiff recyclable sandwich-type polymeric panels, without the use of adhesives, and the panel produced

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8617330
APP PUB NO 20100215935A1
SERIAL NO

12670996

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention describe a process and an installation for the production of stiff recyclable sandwich-type polymeric panels, preferably polypropylene-based panels, and the panel obtained, comprising three lines, in one of which a polymeric polypropylene-based foamed core is produced by extrusion (line A); the structural skins are produced in a second line (line B), which skins are formed by a polypropylene-based lamina reinforced with wood fiber, on which lamina there is applied an also polypropylene-based surface coating layer reinforced with glass fibers; in the third line the structural skins produced in line B are adhered by heat and pressure to the foamed core produced in line A. The sandwich panel produced has a thickness between 7 and 40 mm, an overall density of 400-700 kg/m3 and an elastic modulus of 5-10 GPa.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ULMA C Y E S COOPSPAIN ONATE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
de, Sousa Pais Antunes Marcelo Terrassa, ES 3 20
Fabian, Mariezkurrena Aitor Onate, ES 2 20
Velasco, Perero Jose Ignacio Terrassa, ES 2 20

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00