Conductive film, corrosion-resistant conduction film, corrosion-resistant conduction material and process for producing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8613807
APP PUB NO 20100200120A1
SERIAL NO

12656459

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A conductive film comprises a phosphide particle coated film formed by attaching raw material particles including phosphide particles comprising a compound of Ti and/or Fe, and P to a surface of a substrate material. This conductive film exhibits good corrosion resistant conductivity, and can be easily formed at low costs because of comprising the phosphide particle coated film. A corrosion-resistant conduction film comprises an iron-containing titanium phosphide layer containing Ti, Fe and P as essential basic elements. A corrosion-resistant conduction material having this corrosion-resistant conduction film on a surface of a substrate exhibits good corrosion resistance or conductivity. This corrosion-resistant conduction material can be obtained, for example, by a process comprising a plating step of forming an Ni plating layer on a surface of a Ti-based material substrate and a nitriding step of applying nitriding treatment to the Ti-based material substrate after the plating step at not more than 880 deg. C.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
KABUSHIKI KAISHA TOYOTA CHUO KENKYUSHO41-1 YOKOMICHI NAGAKUTE-SHI AICHI-KEN 480-1192

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Horie, Toshio Seto, JP 19 126
Kitahara, Gaku Aichi-gun, JP 5 19
Kobayashi, Takao Seto, JP 167 3364
Oshima, Shigeki Obu, JP 1 6
Shimizu, Fumio Toyota, JP 55 985
Suzuki, Ken-ichi Nagoya, JP 28 273
Suzuki, Nobuaki Nisshin, JP 86 921

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 24, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00