Structure and fabrication process of super junction MOSFET

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8604541
SERIAL NO

13441101

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This invention discloses a specific superjunction MOSFET structure and its fabrication process. Such structure includes: a drain, a substrate, an EPI, a source, a side-wall isolation structure, a gate, a gate isolation layer and source. There is an isolation layer inside the active area underneath the source. Along the side-wall of this isolation layer, a buffer layer with same doping type as body can be introduced & source can be extended down too to form field plate. Such buffer layer & field plate can make the EPI doping much higher than convention device which results in lower Rdson, better performance, shorter gate so that to reduce both gate charge Qg and gate-to-drain charge Qgd. The process to make such structure is simpler and more cost effective.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
WUXI VERSINE SEMICONDUCTOR CORP LTDCHUANGYUAN CENTER 1001 21-1 CHANGJIANG ROAD WUXI NEW DISTRICT WUXI JIANGSU PROVINCE

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bai, Yuming Wuxi, CN 19 382
Gao, Yang Wuxi, CN 446 6138
Huang, Qin Wuxi, CN 62 794

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 10, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00