Method for hydro-upgrading inferior gasoline via ultra-deep desulfurization and octane number recovery

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8603324
APP PUB NO 20100236978A1
SERIAL NO

12725939

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method of hydro-upgrading inferior gasoline through ultra-deep desulfurization and octane number recovery. The method comprises the following steps: cutting inferior full-range gasoline into light fraction gasoline and heavy fraction gasolines; contacting the light fraction gasoline successively with a catalyst for selective diene removal and a catalyst for desulfurization and hydrocarbon multi-branched-chain hydroisomerization; contacting the heavy fraction gasoline with the catalyst for selective hydrodesulfurization in a first reactor, and contacting the reaction effluent from the first reactor with a catalyst for supplemental desulfurization and hydrocarbon aromatization/single-branched-chain hydroisomerization in a second reactor; and blending the treated light fraction gasoline and the heavy fraction gasoline to obtain the ultra-clean gasoline product. The hydro-upgrading method of the invention is suitable for hydro-upgrading inferior gasoline, especially for hydro-upgrading inferior FCC gasoline with ultra-high sulfur content and high olefin content to obtain excellent hydro-upgrading effects.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CHINA UNIVERSITY OF PETROLEUM - BEIJING (CUPB)NO 18 FUXUE ROAD CHANGPING BEIJING 102249

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Bao, Xiaojun Beijing, CN 16 6
Fan, Yu Beijing, CN 49 124
Liu, Haiyan Beijing, CN 50 63
Shi, Gang Beijing, CN 61 140

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 10, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00