Battery, manufacturing method of battery, and check method of electrolyte leakage

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8603194
APP PUB NO 20060134511A1
SERIAL NO

11296495

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

There is provided manufacturing method of battery comprising adhering process (S1) to adhere fluorescent material (leakage indicator including fluorescein) which emits fluorescence in response to predetermined light (ultraviolet radiation) irradiated under condition that electrolyte exists, to at least one portion of a surface on a battery case, and leakage detecting process (S2 through S9) to detect presence/absence of electrolyte leakage with fluorescence which an adhered portion emits in response to the predetermined light (ultraviolet radiation) irradiated on at least the adhered portion which has adhesion of the fluorescent material (leakage indicator including fluorescein), out of the surface on the battery case.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
TOYOTA JIDOSHA KABUSHIKI KAISHA1 TOYOTA-CHO TOYOTA-SHI AICHI-KEN 471-8571

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ito, Kojiro Toyohashi, JP 20 187
Onishi, Masato Toyohashi, JP 33 322
Ozawa, Michio Toyohashi, JP 4 18
Yamashita, Toshiyuki Toyohashi, JP 47 367

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 10, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00