Barrier layer removal method and apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8598039
APP PUB NO 20110177692A1
SERIAL NO

13059814

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

This invention relates to a method and apparatus by integrating semiconductor manufacturing processes of stress free electrochemical copper polishing (SFP), removal of the Tantalum oxide or Titanium oxide formed during SFP process and XeF2 gas phase etching barrier layer Ta/TaN or Ti/TiN process. Firstly, at least portion of plated copper film is polished by SFP. Secondly the barrier metal oxide film formed during SFP process is etched away by etchant. Finally, the barrier layer Ta/TaN or Ta/TiN is removed with XeF2 gas phase etching. The apparatus accordingly consists of three sub systems: stress free copper electropolishing system, barrier layer oxide film removal system and barrier layer Ta/TaN or Ti/TiN gas phase etching system.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ACM RESEARCH (SHANGHAI) INCBUILDING 4 NO 1690 CAI LUN ROAD CHINA (SHANGHAI) PILOT FREE TRADE ZONE PUDONG NEW AREA SHANGHAI 201203 201203

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Jia, Zhaowei Shanghai, CN 38 48
Wang, Hui Shanghai, CN 1115 8921
Wang, Jian Shanghai, CN 1906 17240
Wu, Junping Shanghai, CN 7 31
Xie, Liangzhi Shanghai, CN 33 68

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 3, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00