Method for welding hollow structure

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8590767
APP PUB NO 20120325894A1
SERIAL NO

13164867

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In the method for welding a hollow structure of the present invention, a rib is placed between a first joining member and a second joining member, and friction stir welding and fixing a place where the rib is placed between the first and the second joining member are conducted. Thus, friction stir welding is accomplished without changing the shape of an extrusion part or partly changing the shape of the extrusion part with insertion of a simply shaped rib.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
RESEARCH INSTITUTE OF INDUSTRIAL SCIENCE & TECHNOLOGYPOHANG-CITY KYUNGSANGBUK-DO 790-330
WINXEN CO LTD641-847 PARYONG-DONG UICHANG-GU GYEONGSANGNAM-DO CHANGWON-SI 641-847
HYUNDAI ROTEM COMPANY488 CHANGWON-DAERO UICHANG-GU CHANGWON-SI GYEONGSANGNAMDO 51407

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chang, Woong-Seong Pohang, KR 1 15
Chun, Chang-Kun Pohang, KR 1 15
Park, In-Gyu Suwon-si, KR 28 122
Roh, Tae-Sung Changwon-shi, KR 1 15

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00