Tower element

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8590276
APP PUB NO 20100319276A1
SERIAL NO

12865505

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention concerns a tower element for a tower, preferably for a wind power plant, where several tower elements with an outer surface and an inner surface are mounted on top of each other, where the periphery of the tower element is made up of a number of segments provided with inwardly facing flanges at the longitudinal sides, the flanges being connected to corresponding flanges on laterally arranged segments. The individual segments are made with an overlap on the outer surface in the transverse joints and with a butt joint at the inwardly facing flanges. By the invention there is achieved flexibility in production and during transport and mounting. With an overlap on the outer surface between two segments, mechanical joining can be performed between two segments in transverse direction. This mechanical joint between two segments results in a more stable construction and a rigidity substantially corresponding to the rigidity that may be achieved in segments joined by welding.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ANDRESEN TOWERS A/SLINDHOLM HAVNEVEJ 33 NYBORG DK-5800

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kryger, Arne Langeskov, DK 4 67
Ryholl, Lars Middelfart, DK 3 73

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 26, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00