PWM control of dual active bridge converters

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8587975
APP PUB NO 20110249472A1
SERIAL NO

13078367

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A Dual Active Bridge (DAB) converter and a Pulse Width Modulation (PWM) scheme for controlling the DAB converter are disclosed. In general, the DAB converter includes a transformer, a first H-bridge that is connected to a primary winding of the transformer and controlled via first control signals, and a second H-bridge that is connected to a secondary winding of the transformer and controlled via second control signals. A controller provides the first and second control signals based on an input-to-output voltage ratio and load of the DAB converter such that, in addition to phase shift control, PWM control is simultaneously applied to both the first H-bridge and the second H-bridge when the DAB converter operates at low power and PWM control is applied to only one of the first H-bridge and the second H-bridge when the DAB converter operates above low power.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
PEREGRINE POWER LLC27350 SW 95TH AVENUE SUITE 3022 WILSONVILLE OR 97070

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ayyanar, Rajapandian Gilbert, US 11 166
Jain, Amit Kumar Portland, US 16 150

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 19, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00