Anti-friction coating

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8586513
APP PUB NO 20110143975A1
SERIAL NO

12928359

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention relates to an anti-friction coating (4) made from a tin-based alloy which, in addition to tin, contains at least one other element from the group comprising antimony and copper, optionally lead and/or bismuth, and optionally at least one element form a group comprising zirconium, silicon, zinc, nickel and silver, and the proportion of antimony is at most 20% by weight, the proportion of copper is at most 10% by weight, the total proportion of lead and bismuth is at most 1.5% by weight, the total proportion of copper and antimony is at least 2% by weight and the total proportion of zirconium, silicon, zinc, nickel and silver is at most 3% by weight, and tin is present bonded in the form of inter-metallic phases and freely as a tin phase with beta-tin grains. The tin grains with a beta-tin structure have a mean size in μm which is calculated on the basis of the formula K=A/(S+3*C+O), and the tin grains with a beta-tin structure in the tin-based alloy in any event have a mean grain size of at least 2.5 μm.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MIBA GLEITLAGER AUSTRIA GMBH4663 LAAKIRCHEN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Zidar, Jakob Altmuenster, AT 10 82

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 19, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00