Process for producing fuel pellets

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8585785
APP PUB NO 20090223119A1
SERIAL NO

11571761

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for production of fuel pellets from a biological material, preferably saw dust, wood or similar, where the method comprises the following steps: supplying the material to a drying step (1) and dry the material to a relative humidity from 40-65 weight-percent to 30-45 weight-percent; supplying the material from the dryer step (1), optionally via an intermediate storage step (2), to a reactor step (3, 3′) and heat the material to 200-300° C. by supply of steam; keeping the material in the reactor at the achieved temperature in sufficient time to soften the material; reducing the pressure of the reactor step (3, 3′) in at least two steps, in order to defibrate the material and release of lignin, and supply the material from the reactor step (3, 3′) to an additional drying step (5), optionally via an intermediate storage step (4), and optionally pelletizing of the material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CAMBI TECHNOLOGY ASPOSTBOKS 78 N-1371 ASKER NORWAY

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brusletto, Rune Jar, NO 5 16
Holte, Hans Rasmus Reistad, NO 7 18
Solheim, Odd Egil Hvalstad, NO 8 74

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 19, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00