Mirror device, mirror array, optical switch, mirror device manufacturing method, and mirror substrate manufacturing method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8582189
APP PUB NO 20120162737A1
SERIAL NO

13412514

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A mirror device includes a mirror (153) which is supported to be pivotable with respect to a mirror substrate (151), a driving electrode (103-1-103-4) which is formed on an electrode substrate (101) facing the mirror substrate, and an antistatic structure (106) which is arranged in a space between the mirror and the electrode substrate. This structure can fix the potential of the lower surface of the mirror and suppress drift of the mirror by applying a second potential to the antistatic structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON TELEGRAPH AND TELEPHONE CORPORATION5-1 OTEMACHI 1-CHOME CHIYODA-KU TOKYO 1008116 JAPAN

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Inagaki, Shuichiro Kanagawa, JP 11 208
Ishii, Hiromu Kanagawa, JP 17 172
Machida, Katsuyuki Kanagawa, JP 53 1161
Morita, Hirofumi Kanagawa, JP 71 566
Murakami, Makoto Tokyo, JP 92 1029
Sasakura, Kunihiko Kanagawa, JP 9 208
Sato, Makoto Kanagawa, JP 741 8183
Shimokawa, Fusao Kanagawa, JP 17 219
Uchiyama, Shingo Kanagawa, JP 14 194
Yamaguchi, Johji Kanagawa, JP 11 108

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 12, 2025
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00